Memphis Development & Infrastructure

Two Very Different Pools, One Question: Who Gets to Swim in Memphis?

In early June, kids and adults in Uptown Memphis crowded back into the Bickford Aquatic Center after a two-year shutdown and $2 million of renovations.1,2 The scene—a packed public pool, just in time for summer—was a visible payoff from a city that had finally put real money into a neighborhood amenity.

the central idea of the story, grounded in Memphis

Across town, the University of Memphis invites people to “dive into a world of aquatic bliss” at one of its two swimming facilities, including a four-foot-deep outdoor pool with submerged lounge chairs and games.3 But access there runs through campus recreation membership and guest policies; there is no membership that covers only the pools.3

Put side by side, the two properties sketch a quiet but important landscape question for the city: when Memphis puts water on the map, who actually gets in?

What the city has actually put back on the map

Bickford’s reopening was not a routine seasonal start. Local coverage notes that getting the center back online took roughly two years and $2 million in renovation work.1,2 The doors reopened with a ribbon cutting on Thursday, June 4, 2026, with Mayor Paul Young and other city leaders on hand.1,2 The same reports describe the pool deck full of children and adults using the space immediately.1

Those details matter because they define Bickford as more than a line item. Time, capital and the mayor’s presence all signal that this particular neighborhood facility rose high enough in the stack of needs to get an expensive restart.

The evidence available here does not show where the $2 million came from—city operating funds, bonds, or the county’s capital improvement plan—only that this level of investment was made and that it resulted in a reopened aquatic center in Uptown Memphis.1,2 Without additional documentation, tying it directly to the Shelby County Capital Improvement Plan would be speculative.

A different kind of water access at the university

The University of Memphis, for its part, operates two “state-of-the-art swimming facilities.”3 One is an outdoor pool at the Wellness Center, explicitly described as designed for leisure, with a water volleyball net, a basketball goal and a lift.3 The same description notes that the pool is four feet deep and includes a wet deck with lounge chairs submerged in six inches of water.3

Access is not fully open to the general public. The university states that the pools are open to “all students, members and guests,” and that memberships specifically for pool and aquatics-center use are not available.3 In other words, the water is there, but it sits inside a campus recreation system with its own eligibility and cost structure, which the supplied evidence does not detail.

Based on the available information, that makes Bickford and the university pools two distinct pieces of the city’s aquatic infrastructure: one a neighborhood public facility brought back with a defined renovation budget, the other a campus amenity embedded in a membership regime.

Why this matters for families and neighborhoods

The difference between these two pools is not just who owns them; it is how easy they are to reach in practice.

  • At Bickford, the city has put $2 million and two years into reopening a pool in Uptown, and reporting shows it was immediately used by children and adults.1,2 That suggests a walk-up neighborhood resource once the gates are unlocked.
  • At the University of Memphis, access depends on being a student, a qualifying member, or their guest, with no evidence of a low-cost, pool-only option.3

The current evidence does not specify where other city-run pools are, how many have been renovated, or how often they are open, so it cannot support citywide claims about aquatic access. What it does establish is that one Uptown facility has had a significant capital refresh and that, elsewhere in the city, similar or better-quality water is effectively gated behind institutional status.

Where the bigger system shows through

Shelby County’s public documents confirm that civic facilities—from an election administration building to the Shelby County Training Academy and the FedExForum—appear in the capital planning process.4 The document excerpted here does not list specific dollar amounts or timelines for parks and recreation projects, so we cannot quantify how Bickford compares to, say, spending on those other buildings.

We can say that in the same metro where county and city governments maintain assets like FedExForum4 and specialized county buildings,4 it has taken a multi-million-dollar effort to get a single neighborhood aquatic center back into service.1,2 That is not an argument about priorities by itself, but it does show that public water access has to compete with other civic facilities for capital.

On the private side, the University of Memphis pools show that high-quality aquatic experiences—with features like submerged loungers and structured recreation elements—already exist in the city, but under a different set of rules.3 The evidence here does not show whether the city is trying to match that standard in public settings, or simply keep basic neighborhood pools functional.

What the evidence cannot yet answer

Several questions that might matter for families, health advocates or housing observers cannot be answered from the current record without guessing:

  • Whether Bickford’s $2 million renovation added new features, expanded capacity, or simply repaired existing infrastructure is not described in the supplied coverage.1,2
  • The Shelby County capital document excerpts confirm the existence of certain county facilities but do not list parks or pool appropriations in the portions provided, so we cannot place Bickford in a broader county parks budget.4
  • The university’s aquatics page does not break down membership pricing, subsidies, or any neighborhood outreach; it only sets the rule that pool-only memberships are unavailable.3

Those gaps mean this story can establish that a North Memphis public pool required a significant, time-consuming investment to reopen, that university pools operate on a different model, and that both sit within a county infrastructure system that also funds other civic assets. It cannot responsibly conclude how equitable the overall distribution of aquatic access is, or whether Bickford marks a shift in county or city capital strategy.

If this is the beginning of a pattern, not a one-off

Within the limits of the evidence, one reasonable inference is that if Memphis and Shelby County consistently commit seven-figure sums and multi-year timelines to reopen or upgrade neighborhood aquatic centers, public water access could begin to look less like a patchwork of aging facilities and more like a deliberate system. That is a conditional statement: it depends on similar investments being made and completed elsewhere.

Conversely, if Bickford remains one of only a few such projects, then the contrast with institution-only pools—like those at the University of Memphis—will remain sharp: high-quality water for those already inside membership systems, and sporadic access for everyone else.

Right now, the verified facts stop at one renovated neighborhood facility, a well-appointed but membership-limited campus pair of pools, and the knowledge that county capital planning also has to support other civic buildings. Any broader conclusion about a transformation of Memphis’s parks and recreation system would go beyond what the evidence supports.

the measurable proof behind the finding

Sources

  1. www.actionnews5.com. Public pool uptown memphis reopens after 2m renovation View source
  2. www.fox13memphis.com. Article 3bc42826 3504 42a8 a45e e079ec20b009 View source
  3. www.memphis.edu. Aquatics View source
  4. www.shelbycountytn.gov. Capital Improvement Plan CIP View source
← Previous What 750 Announced Factory Jobs Would Mean in… Next → Birmingham’s Valley Creek Rail‑to‑Trail Pulls in Federal Money…
← All Articles